Vesgantti 109" U Shaped Cloud Sectional Sofa, Comfy Corduroy Upholstered by Vesgantti

Vesgantti 109" U Shaped Cloud Sectional Sofa, Comfy Corduroy Upholstered

$999.98
Sale price  $999.98 Regular price 
Skip to product information
Vesgantti 109" U Shaped Cloud Sectional Sofa, Comfy Corduroy Upholstered by Vesgantti

Vesgantti 109" U Shaped Cloud Sectional Sofa, Comfy Corduroy Upholstered

$999.98
Sale price  $999.98 Regular price 
Shipping calculated at checkout.

Product Overview

The Vesgantti 109" U Shaped Cloud Sectional Sofa is a Sofas & Couches product. It features spacious and comfortable seating: our 109 inch large u-shaped couch.

Key Features

  • Spacious and Comfortable Seating: Our 109 inch large U-shaped couch features 23.6 inch deep seating area and 24 inch ottoman, creating a ample leisure space for you and your family. This cloud sofa is designed with double-layered high-resilience foam seat cushions, thick back cushions, and 2 armrests pillows, providing ergonomic support for your waist and back. The extremely soft seat cushions make you feel like you're in the clouds, making the sofa an ideal choice for relaxation
  • Premium Corduroy Fabric: The modular sofa is upholstered in wrinkle-resistant & soft corduroy fabric, which feels silky soft to touch. The impressive durability and stain-fighting prowess of corduroy fabric keep your sectional sofas looking fresh and lively, perfet for homes with children or pets. We have multiple colors for option to match different decoration styles for fully meeting your personalized needs. Tips: There may be slight color difference due to light or display reasons
  • Convertible Modular Sectional Sofa: This cloud sofa features a movable ottoman for flexible switching that you create an left facing or right facing L-shaped sofa, or comfortable U-shaped sectional couch. The versatile modular couch allows you to customize the layout to fit your space and lifestyle. The simple solid color design makes this sofa to easily blend into different decoration style and occasions, whether it's the living room, bedroom, office and children's play areas
  • Easy Assembly and Disassembly: This 113.4'' U-shaped sofa will be delivered in 2 boxes and easily carried. Before assembly, please check all parts. You can complete the installation in 30 minutes by following the included detailed instructions. The modular sectional couch is also easy to disassemblec and carry if you would move to a new place. Note: The cushions and pillows are vacuum-packed. After unpacking, please fluff them thoroughly, it may take 48-72 hours for fully expand
  • Stable Structure and Reliable Customer Service: The frames (armrests, backrests, seat frames) of sectional couches are made of wood, making them more stable, durable, andand load-bearing capacity is stronger than other products. Secure screw-on connections keep each part firmly in place, ensuring stability while making them suitable for a variety of body types. If you are not satisfied with the sofa you received, please feel free to contact our customer service team

Why Choose the Vesgantti 109" U Shaped Cloud Sectional Sofa

The Vesgantti 109" U Shaped Cloud Sectional Sofa offers spacious and comfortable seating: our 109 inch large and premium corduroy fabric: the modular sofa is upholstered. These features make the Vesgantti 109" U Shaped Cloud Sectional Sofa a strong option in the Sofas & Couches category.

Best For

The Vesgantti 109" U Shaped Cloud Sectional Sofa is best suited for: a variety of body types.

Quick Summary

The Vesgantti 109" U Shaped Cloud Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 23.6 inches. Seat Height: 19.7 Inches. Weight Limit: 1250 Pounds.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Seat Depth 23.6 inches
Seat Height 19.7 Inches
Weight Limit 1250 Pounds
Seating Capacity 5.0
Product Dimensions 35"D x 109"W x 34.3"H
Item Weight 97.89 Pounds
Leg Length 3.15 Inches
Type Sectional

CARE & MAINTENANCE

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

SHIPPING & RETURNS

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.

You may also like